Rebuilding a Fire-Damaged Facility Around Its Existing Structural Steel
When fire severely damaged Unlimited Integration’s facility, the building required far more than a conventional roof or wall repair.
Metalguard was brought in to determine what could be preserved, restore the existing structural steel, and rebuild the facility around its remaining primary frame.
Rather than demolishing the entire building, Metalguard used an engineered structural repair and reconstruction approach. The viable primary steel columns and beams were preserved and reinforced while damaged secondary framing, roofing, wall systems, insulation and interior components were removed and replaced.
The project ultimately combined fire damage structural repair, structural steel reinforcement, metal building reconstruction, new roof and wall systems, insulation, concrete repairs and a new structural steel mezzanine.
Fire-damaged facility before reconstruction and after rehabilitation.
The first challenge was determining what could be preserved and what had to be removed.
Metalguard began with site preparation, including temporary fencing and coordination of dumpsters for ongoing debris removal. The demolition operation removed fire-damaged building components while protecting the existing primary structural steel framework.
Demolition included:
The objective was to remove damaged building systems while preserving the existing rigid frame wherever it remained structurally viable.
Once demolition was complete, the facility had been reduced to its primary structural steel framework, the foundation for reconstruction.
With the damaged components removed, Metalguard moved into the structural rehabilitation phase based on engineered plans provided by SMS Engineering.
The existing rigid frame was preserved, but additional reinforcement was required to restore structural integrity following the fire.
Metalguard installed:
Following completion of the structural repairs, Metalguard power washed the structural steel to remove fire-related residue and contaminants.
The repaired structure was then prepared for final engineering inspection.
The reconstruction did not proceed until the repaired structural frame had been reviewed and approved.
With the primary structure repaired and approved, Metalguard rebuilt the secondary structural framing supporting the new building envelope.
New framing included:
The new secondary framing recreated the structural support system required for the new roof and wall assemblies while establishing the openings required for the building’s new architectural components.
The roof was rebuilt using a new 26-gauge PBR metal roof system.
The new roof system included:
The reconstructed roof provided a new weather-tight exterior while integrating with the rehabilitated structural frame and new secondary framing.
Metalguard installed a new insulation system to create a complete thermal envelope, rebuilding the facility required restoring more than the appearance.
The completed roof and wall assemblies provided the reconstructed facility with a new insulated building envelope.
New 26-gauge PBR wall panels were installed to restore the building enclosure.
Metalguard also installed the required trim components, including:
The new wall system restored the exterior while incorporating the openings required for doors, windows and overhead access.
The reconstructed facility incorporates new access points, glazing and overhead equipment designed around Unlimited Integration’s operational requirements.
These components were integrated into the reconstructed building envelope and newly framed openings.
The fire damage and previous building configuration also required modifications to the existing concrete systems.
Metalguard’s concrete work included:
These repairs prepared the existing floor for the reconstructed facility and the new mezzanine system.
The building rehabilitation also provided an opportunity to replace the damaged mezzanine with a new structural system.
Metalguard furnished and installed a new structural steel mezzanine consisting of:
The new structural steel framework was integrated into the reconstructed facility and designed to support the new elevated floor system.
Once the mezzanine steel framing was erected, Metalguard installed 22-gauge form deck over the structural framing to support the new concrete floor.
The mezzanine concrete floor was placed over the structural steel system to create the finished elevated work area.
The Unlimited Integration project required Metalguard to coordinate two major construction efforts as one integrated rehabilitation:
Demolition → Structural repair → Engineering approval → Secondary framing → Insulation → Roof → Walls → Doors & windows → Concrete repairs
Structural columns → Primary beams → Floor joists → Form deck → Concrete floor
The two scopes came together around one objective:
When fire damages a pre-engineered metal building, complete demolition and replacement may not always be necessary.
If the primary structural frame remains viable, an engineered repair and reconstruction approach may allow portions of the existing structure to be preserved while damaged building systems are removed and replaced.
For Unlimited Integration, Metalguard preserved the viable primary steel frame, completed engineered structural repairs, and rebuilt the facility around it.
This approach allowed the project to combine structural steel repair, metal building reconstruction, new building envelope systems and structural mezzanine construction into one coordinated rehabilitation.
Metalguard provides engineered repair solutions for damaged and aging metal buildings, including:
Whether a building has experienced fire, equipment impact, corrosion, storm damage or other structural deterioration, Metalguard can help evaluate the existing structure and determine the appropriate repair approach.
In some cases, yes. The extent of damage and the condition of the existing structural frame must be evaluated to determine what can be preserved, repaired or replaced. Engineered repair plans may allow viable structural steel to remain in service while damaged components are reconstructed.
The existing structure is evaluated to determine its condition and whether it can be rehabilitated. Engineering requirements and project-specific repair details determine which structural components can remain and what reinforcement or replacement is required.
Yes. Depending on the condition and engineering requirements, structural steel members can potentially be reinforced rather than completely replaced. Repair methods may include additional steel, bracing, plates or other engineered reinforcement.
Structural repairs should be evaluated and designed based on the specific building conditions and applicable structural requirements. Metalguard works with engineering professionals on projects requiring engineered repair solutions.
Yes. When the existing primary frame is viable, damaged secondary framing and building systems can potentially be removed and reconstructed around the existing structural steel.
Metalguard works on structural damage involving steel columns, rafters, beams, purlins, girts, bracing and other structural components. Projects may involve fire damage, impact damage, corrosion, storm damage or modifications to existing metal buildings.
When a fire, impact, storm or other event damages your metal building, the next step is determining what can be saved and what needs to be repaired or replaced.
Metalguard provides engineered structural repair and metal building reconstruction services for commercial and industrial facilities.
Have a damaged metal building?
Send us photos and a few details about your facility, and our team can help determine the next step.