- Before, abandoned, ignored. Front view. Metal roofing contractor, metal building renovation project.
- Before metal building repairs , rear view of pre-engineered metal building. Damaged metal wall panel need repairs.
- Before – rear view of abandoned building, metal building insulation added.
This abandoned building was very rusty.
We installed 3 new overhead doors, removed three overhead doors, installed two new man/pass doors, removed and replaced 15 purlins, and cleaned, primed and painted all of the steel.
- Because this building was not in use we were able to open it up to allow the work to be accomplished more efficiently. After purlins replaced, frame cleaned and painted.
- The metal building foot print was modified to meet the current production needs. This is the frame of a new awning.
- Metal building insulation replacement renovation in process
- This picture shows extra insulation between the roof purlins
- After a metal building wall and roof renovation – removed three overhead doors, re-located two overhead doors. Rear view. Small addition at front right.
- Front view with new eave addition and 110′ awning added.
- Rear back- a repurposed building.
Abandoned Steel building renovation
Sometimes the use of a building changes, below a steel / metal building’s use was transferred from its previous use as a storage building to a process building. Project completed April 2017, Northwest Houston.
We replace many of the roof purlins and wall girts that were rusted thru. We also repaired the base of rotted out columns by cutting out sections and welding in to place replacement steel.